Up and Under Group

Recent Project – no congestion

It was a slow day on the canal and the perfect application for our floating platform system.  Here, the soffit of the bridge is inspected while the road is left undisturbed.  Traffic congestion and operative safety are major consideration during highway and rail structure inspections.

The benefits to the client include:

  • Minimal disruption
  • Reduced costs
  • Easier planning
  • Good publicity
  • Daylight inspection
  • Safer work environment

 

4114 canal bridge 4 663x497 Recent Project   no congestion Inspecting without congestion

We love to make people’s lives easier and safer, if you want us to help you with a project call us on 01270 589615. For more information on inspection see here

This entry was posted in access, Bridge Inspection, over water and tagged , , , .