Up and Under Group

Recruiting now

Opportunities in both our access and non-access divisions

Immediate start positions for those who prefer to work at ground level, all inspection training provided

Want to know more? DM us via Facebook or send an email to admin@upandundergroup.com and tell us a little bit about yourself

Latest Project – Bridge Delamination Survey

Miles+3 Latest Project   Bridge Delamination Surveymiles+1 Latest Project   Bridge Delamination SurveyUp and Under were contacted by our client to undertake a hammer tap survey and remove loose concrete from a highway structure following reports of concrete falling from the bridge.

 

Miles+2 Latest Project   Bridge Delamination Survey
The  high level viaduct carries one of the main arterial routes in the North West and local companies occupy areas below the structure.

 

Fortunately we were able to react immediately and our inspectors were able inspect the structure and remove the loose concrete ensuring the safety of the occupants of the area under the bridge.

Miles+4 Latest Project   Bridge Delamination Survey
We will be returning again soon to carry out a full detailed inspection of the whole structure.
 
Do you have a problem requiring a solution?
 
Give us a call on 01270 589615
 
Problem Solved.

This entry was posted in Bridge Delamination, Bridge Inspection, Hammer Tap Survey, Immediate Response, Loose Concrete.

Leave a Reply

Your email address will not be published. Required fields are marked *

*