Building a 300 x 300 x 1500 concrete column sounds like a straightforward job for any builder. So why call Up and Under?
Foundation cast on top of blinding concrete with formwork in place for the column |
Well this particular column is in a cave – designed to support the roof – at the bottom of a 20m cliff, in a beauty spot.
The concrete column, injection pointed to the roof |
All the materials had to be transported along a narrow track, concrete had to be mixed and lowered down the cliff face before being poured into the formwork. When the shutters were struck the column was faced with locally sourced stone.
Stone clad, with ground restored |