Up and Under Group

Recruiting now

Opportunities in both our access and non-access divisions

Immediate start positions for those who prefer to work at ground level, all inspection training provided

Want to know more? DM us via Facebook or send an email to admin@upandundergroup.com and tell us a little bit about yourself

Latest Project – Inspection Clip-ped

It sometimes happens that we have our confined spaces and rope access skills tested on the same project.  The principal inspection of Pen Y Clip Viaduct was one such occasion.

4078+viaduct Latest Project   Inspection Clip ped
We discover we have an engineer with an art A level

Firstly we had to inspect the over 100 voids per span requiring the engineers to employ confined spaces techniques to safely access all section of the structure.

%name Latest Project   Inspection Clip ped
On the inside

Then it gets more visually exciting with the inspection of the piers using rope access techniques.  This reduced the amount of traffic management required to a minimum thus causing minimum inconvenience to the road users.

4078+(1) Latest Project   Inspection Clip ped
Clever rope-work brings all elements within touching distance

We are fortunate to have a team of experienced engineers with a host of access skills, giving our clients the best of all worlds.

Can we help you? call 01270 589615

This entry was posted in asset management, bridge, Bridge Inspection, Confined Space, inspection, work at height.

Leave a Reply

Your email address will not be published. Required fields are marked *

*